Listed below are the maintenance related problem statements
that were rated by AASHTO for funding in FY 2006. Statements
in bold are the ones that were funded.
| C-16 |
Performance Measures for Pavement
Management Systems |
| C-20 |
Development of Improved Pavement
Marking Management Processes to Enhance Cost-Effectiveness
and Facilitate Implementation of Minimum Requirements
for Retroreflectivity |
| C-24 |
Barrier System Maintenance
Procedures (NCHRP
Project Number 22-23) |
| D-05 |
Protection of Concrete Deck
Patches to Extend the Service Life of the Repair by Using
Low Viscosity Polymer Materials |
| F-01 |
Pavement and Bridge Preventive
Maintenance Recommended Treatment Cycles |
| F-02 |
Development of a Cost-Effective
Chip Seal System for Pavement Preservation (NCHRP
Project Number 14-17) |
| F-03 |
Effectiveness of Paver-Placed
Surface Treatments as a Thin Overlay to Extend the Service
Life of Structural Concrete Decks |
| F-04 |
Develop AASHTO Guidelines
for Safety Rest Areas |
| F-05 |
Develop AASHTO Guidelines
for Vegetation Control (NCHRP
Project Number 14-16) |
| F-06 |
Innovative Concrete Bridge
Deck De-icing with Microwave Energy |
| F-07 |
Development of a Winter Maintenance
Performance Measurement System Incorporating Friction
Measures |
| G-23 |
Temporary Traffic Control
Near Urban Freeway Interchanges |
| SP-01 |
Determining the Impact of
Technical Training on Transportation System Performance
by Developing Measures of Effectiveness |